Este sitio utiliza cookies para que usted tenga la mejor experiencia de usuario.
Si continúa acepta su uso. Para más información puede revisar nuestra Política de cookies

Rehabilitation and Improvement of the Tocache – Juanjui Highway, Pizarra – La Pólvora – Pizarrón – Perlamayo – Campanilla Stretch

Improvement of already defined 89.8 km stretch, with 4 bridges and new pontoons and provision of maintenance to 20 bridges and pontoons.

The road has two lanes covered with a hot asphalt layer, berms on both sides and a comprehensive drainage system, with sewer and culverts, in addition to vertical and horizontal signs.

Client

MTC - Provias Nacional

Location

San Martín - Peru

Classification

Highways

Period

2017 - 2019

Accumulated turnover or capacity

US$ 124 MM

Activities

Drainage works, pavement.

Peru
Colombia
Spain
Jr. Morro Solar 1010
Santiago de Surco,
Lima 33 - Peru
+51 1 450 1999
Cra. 48 20 - 114 Of. 725
Centro Empresarial,
Ciudad del Rio,
Medellín - Colombia
+57 4 609 6476
Calle Canalejas 22,
piso 2A,
Sevilla - Spain
+34 955785661
+34 638173476