Reaching a maximum height of 80 meters. It includes the placement of a filtering system, improvement of the dam foundation and heigtening of Dike B2.5.
Client
Minsur
Location
Puno - Peru.
Classification
Mass Earth Moving
Period
2017 - 2018
Accumulated turnover or capacity
US$ 12.0 MM
Activities
Corte masivo 140,000 m3
Relleno estructural 500,000 m3
Material de filtros 100,000 m3
Soil liner 42,000 m3
Geomembrana HDPE2mm 4,300 m2