Through the waterproofing of the upstream face from the dike and installation of a pumping system.
Client
Minera Barrick Misquichilca S.A.
Location
La Libertad - Peru
Classification
Mass Earth Moving
Period
2012 - 2013
Accumulated turnover or capacity
US$ 3.4 MM
Activities
Earth moving: 300,000 m³.
Civil works.
Installation of geosynthetics.